The
existing break-up of length of roads/paths is as follows:
| Sr.No |
Width |
Length |
1 |
12’ |
648
Kms |
2 |
15’ |
7
Kms |
3 |
18’ |
113
Kms |
4 |
20’ |
7
Kms |
5 |
22’ |
225
Kms |
6 |
25’ |
20
Kms |
7 |
32’ |
95
Kms |
8 |
40’ |
3
Kms |
|
|
1118
Kms |
The
condition of the roads
in Faridabad is very poor,
hence,
MCF
is
planning to strengthen the road network. In addition to it,
MCF
has
decided
that several roads are to be converted into dual carriageways
with
provision
of Central Verges, Street Light, Signages and service roads.
Because of water logging problem, some roads are to be paved with
concrete pavements. For renewal of internal roads of Faridabad, for widening, concrete pavements, beautification
of round-abouts, slip & service roads and about 60 Nos.
approved colonies
are there in Faridabad where the road network is negligible.
MCF is trying to bridge this gaps and is mobilizing funds
to meet these demands for road network.